69°
EXPIRED
Konig Stereo Multimedia Headset - long lead - £2.62 @ 7dayshop
Konig Stereo Multimedia Headset - long lead - £2.62 @ 7dayshop

Konig Stereo Multimedia Headset - long lead - £2.62 @ 7dayshop

Buy forBuy forBuy for£2.62
GETGet dealVisit site and get deal
Most of these cheap Skype headsets have leads that are just too short to reach the back of the computer comfortably. This one has 2.2 meters of cable, plus an inline volume control. Half usual price, free delivery, and a bit of cashback if you can be bothered.

- Headset with adjustable microphone arm
- In-line volume control
- Ideal solution for internet communication or other voice processing applications.

Specifications:
• Speaker: 30 mm
• Sensitivity: 105 dB
• Impedance: 32 Ohm
• Frequency response: 20 Hz~20.000 Hz
• Power: 100 mW
• Cable length: ± 2.2 m
• Connection: 3.5 mm
• Analogue connection

Post a comment
Avatar
@
    Text