Patio project - how much hardcore will i need?

£0.00 @
Im building an 18 square meter patio and will be putting down about 2 inches of hardcore. Is there an equation to work out how many KGs/Tonnes i will need? Thanks Read More
JayBird Avatar
6y, 8m agoPosted 6 years, 8 months ago
Im building an 18 square meter patio and will be putting down about 2 inches of hardcore.

Is there an equation to work out how many KGs/Tonnes i will need?

Thanks
JayBird Avatar
6y, 8m agoPosted 6 years, 8 months ago
Options

All Comments

(14) Jump to unreadPost a comment
Comments/page:
1 Like #1
2 1 tonne bags will do it, 1 bag will do approx 12 square metsrs at abot 1.3 inch thick, aim to pay about £30-£35 a bag..
Hope that helps..

Edited By: ukmonkey on Aug 16, 2010 17:22: ..
1 Like #2
^^ I make that around a cubic metre and from what I know a cubic metre of hardcore is around 2 tonnes.
#3
cheers guys...so which is it, 1 or 2 tonnes?
banned#4
ide say 1 tonne plus a few disliked relies and you should be fine to cement over - lol
#5
JayBird
cheers guys...so which is it, 1 or 2 tonnes?

You require about 0.9 cuic metres of hardcore, from what I know 1 cubic metre = 2 tonnes so I say you need 2 tonnes.
#6
we just finished our patio was just over 20 sq meters and we used 2.5 tonnes cost about £40 from the pit.
#7
How deep did you lay it?
#8
JayBird
How deep did you lay it?


abt 2 inch deep i think. we went down 5 inch from the damp course then had type 1 compacted down then layer of cenet with 40mm thick slabs on it. took 2.5 tonnes of type 1 and abot just over 1 ton of sand.
#9
Hardcore is around 1.9 - 2 tonnes per cubic metre.
2 inches is approx. 51mm.

18 x 0.051 = 0.92cu m.

So if you round up, you want to cover an area of 1 cubic metre, so you'll need 2 tonnes of hardcore.

Simples....
banned#10
civms47
Hardcore is around 1.9 - 2 tonnes per cubic metre.
2 inches is approx. 51mm.


Hmmmm... I think he might need to stretch it to 52mm !

What are the actual sizes Jaybird?
#11
tryint to work out how many sq mts you would get out of a tonne of hardcore if its layed and packed at 6 inches thick.also how many sq mts youd get out of a tonne of granite sand layed at 4 inches thick.thanks
#12
i need to lay some astroturf... need to put 2x2 battern down then type 1 with sand on top how much do i need ?? oO
banned#13
ballsy
i need to lay some astroturf... need to put 2x2 battern down then type 1 with sand on top how much do i need ?? oO

WOuld help but its broken today!

http://blog.mediatrust.com/wp-content/uploads/2008/12/cball.jpg
#14
ballsy
i need to lay some astroturf... need to put 2x2 battern down then type 1 with sand on top how much do i need ?? oO

About tree fiddy

Post a Comment

You don't need an account to leave a comment. Just enter your email address. We'll keep it private.

...OR log in with your social account

...OR comment using your social account

Thanks for your comment! Keep it up!
We just need to have a quick look and it will be live soon.
The community is happy to hear your opinion! Keep contributing!